New roof installation in Palmetto Bay means a full tear-off, a permitted system and two inspections, because that is what the High-Velocity Hurricane Zone requires. Call and we connect you with a licensed local roofing contractor who inspects the roof and prices it in writing.
A roof replacement is a sequence, and the order is not negotiable because the inspections sit inside it. The contractor inspects and writes an estimate. The products are checked for current Miami-Dade approvals. The permit goes in. Materials are delivered, usually one or two days before the crew. The old roof comes off to the bare deck. Every sheet of decking is checked and the bad ones are replaced. Drip edge goes on at the eaves. The underlayment and the secondary water barrier go down. Flashing is renewed at every wall, valley, chimney, skylight and pipe. The new covering goes on. The ridge vent is set. Then the dry-in inspection, the final inspection, a magnetic nail sweep of the yard and driveway, and a walkthrough with you.
The two inspections are the reason that order matters. The dry-in inspection happens after the deck and underlayment are done but before the covering hides them, so the inspector can still see the fastening and the membrane. The job stops and waits for the inspector, which is normal and not a delay anyone on site can shortcut.
Tear-off is the loudest and most revealing day of the job. The crew strips the old covering, underlayment and flashing down to the plywood, usually inside the first day on a standard home, with a dumpster on site and steady noise from early morning. Most homeowners stay in the house. Keep children and pets inside, move the cars off the driveway, and take anything fragile off the attic shelves, because the vibration shakes dust and objects loose.
What the deck looks like once it is open is the one part of the project nobody can price in advance. Rot, soft spots and delaminated sheets only show when the covering is off. A contractor who has written a deck-repair allowance and a per-sheet price into the quote can replace what they find and carry on. A contractor who has not will stop and ask you for more money on the day, which is a bad position to negotiate from with your roof open.
If it rains mid-job, the crew dries the roof in with underlayment and tarps before leaving each day, so a shower does not leave the house exposed. Work pauses and resumes when the deck is dry. In South Florida an afternoon storm is the usual reason a three-day job becomes a four-day one.
Palmetto Bay is inside the High-Velocity Hurricane Zone, a special wind region in the Florida Building Code that covers exactly two counties, Miami-Dade and Broward. It came out of Hurricane Andrew, which went through this area in 1992. For a standard home the design wind speed is 175 mph as a three-second gust under the code's 8th Edition, and the 9th Edition takes effect on December 31, 2026.
In practice three requirements show up on your quote. Every component needs a current Miami-Dade Notice of Acceptance, which is a legal document for one specific product that dictates its fastening pattern and which underlayment it may be paired with. A statewide Florida product approval number is not sufficient on its own. The underlayment for shingle work has to be a self-adhering ASTM D1970 peel-and-stick membrane across the entire deck, over an approved mechanically attached base sheet, rather than only at the eaves and valleys. And Florida requires a secondary water barrier after tear-off, which in the HVHZ is that same full-deck membrane.
Published figures put HVHZ-approved products at roughly $1,500 to $4,000 more than the same job outside the zone. Nobody is marking that up; it is what the specification costs. It is also why an out-of-area quote can come in under a local one for work that would not pass inspection here.
Local roofers quote Palmetto Bay replacements at $8,500 to $25,000 and up. Shingle re-roofs on comparable 1,200 to 1,800 square foot homes nearby run about $9,500 to $14,000. The published 2026 national ranges are roughly $8,000 to $18,000 for asphalt shingles, $15,000 to $45,000 for metal and $20,000 to $50,000 for tile, and Verisk put the average completed U.S. replacement at $17,631 in 2025.
Your roof is measured in squares, which are hundred-square-foot units of actual roof surface, and a typical single-family roof is roughly 20 to 30 of them. That is why the number cannot be worked out from the floor area of the house: pitch and overhangs add surface, and a steep or cut-up roof with valleys, dormers and penetrations takes more labour and more flashing. A straightforward roof is one to three days of work, a steep or complex one four to five.
A complete written quote names the material and brand with its NOA number, tear-off and disposal, the underlayment type, flashing, ventilation, permit fees, a deck-repair allowance with the per-sheet price, both warranties, the payment schedule and the timeline. If one of those is missing, ask about it before you sign rather than after tear-off.
Two or three itemized quotes from licensed local contractors is the right number, compared line by line on scope rather than on the bottom figure. The cheapest quote is often the one that left out tear-off, the permit or the warranty registration. On payment, the normal structure is a deposit to order materials, a progress payment and the balance after the final inspection passes. Nobody should be asking for the whole job up front.
Active installation on a standard shingle roof is usually one to three working days. Tile takes longer, roughly six to twelve days, because of the weight handling and fastening. Metal varies by system and needs the contractor's confirmation. Before any of that, permit review in Palmetto Bay typically runs five to ten business days, and materials usually land one or two days before the crew does.
Yes, and in Miami-Dade there are no exceptions for a full replacement. The licensed contractor files the permit, schedules the inspections and closes it out under their own license. If a contractor asks you to pull your own roofing permit, treat that as a red flag.
A Notice of Acceptance is a certification from Miami-Dade Product Control proving one specific product was tested and approved for High-Velocity Hurricane Zone conditions. Every component needs one here: shingles, tile, metal panels, underlayment, fasteners and edge metal. A Florida statewide product approval number is not enough on its own, and NOAs expire, so the contractor verifies current status before filing the permit.
They photograph it and replace the bad sheets before anything new goes on. That cost should already be covered by the deck-repair allowance and the per-sheet price written into your quote, which is exactly why a good quote lists both before tear-off day rather than after it.
Call or send the form. We connect you with a licensed local roofing contractor who inspects the roof and prices it in writing. You pay us nothing.